Search site
AIT



787 Projects

The Boeing 787 Dreamliner was the first commercial jet to be made of an advanced composite material – a combination of graphite and epoxy resin. The challenge this presented allowed AIT to capitalize on our extensive experience with composite materials and work on many different 787 integration projects.

With this new material came many different innovative solutions in turnkey factory integration, assembly, and product development to achieve unprecedented levels of performance.

AIT was in a unique position as the only supplier to manage the integration of all 787 Dreamliner subassemblies.



AIT responsibilities for 787 assembly


On 7-8-7 (July 8, 2007) the first 787 was built, painted, and viewed by 15,000 guests. AIT tools helped build some of the individual sections and also assisted with the final assembly of the 787 at Boeing's huge plant in Everett, WA.




youtube.com video showing Boeing 787 Part Deliveries & Virtual Assembly


Click Here for a listing of all AIT projetcs

«Home »«About AIT»«Projects »«Solutions »«Contact AIT »«AIT Canada »«IMS »«Search AIT »

© 2011 Advanced Integration Technology, Inc. All rights reserved.

 

 

Download 787 Overview PDF

Adobe Acrobat Reader Required. Click button to download.


Achievements
Met composite material challenges head on by revolutionizing aircraft automation processes

Significantly reduced labor and equipment costs for partners with technological advances in assembly automation

Developed new flexible, automated drilling technologies

Curtailed cycle and ramp-up times with turnkey solutions

Created substantially more economical, clean, and safe factory environments for specific partners