Search site
AIT



Spirit 787 Section 41 Mandrel Assembly/Disassembly
Wichita, KS

AIT served as the main supplier for the Section 41 mandrel assembly and disassembly systems at the Spirit AeroSystems 321,000-square-foot facility in Wichita, KS. AIT’s mandrel handling systems automatically assemble and disassemble the carbon fiber lay-up mandrel segments as part of the overall production process. The 787’s Section 41 is the 22-foot wide forward fuselage nose section.

  • Served as systems integrator and main supplier for mandrel assembly/disassembly
  • Delivered mandrel handling system
    • Assembly station: one mandrel handler and two ring manipulators
    • Disassembly station: one mandrel handler, two ring manipulators, four section manipulators

Advantages

  • Speed and streamline assembly/disassembly processes
  • Create leaner labor force with automation


Assembly tool


First mandrel segment in mandrel handler


Assembly tool with five segments


Disassembly tool – clam shells holding first barrel


Disassembly tool


Click Here for a listing of all AIT projetcs

«Home »«About AIT»«Projects »«Solutions »«Contact AIT »«AIT Canada »«AIT Sweden »«Search AIT »

© 2008 Advanced Integration Technology, Inc. All rights reserved.

 

 

Download 787 Overview PDF

Adobe Acrobat Reader Required. Click button to download.


Advantages
Speed and streamline assembly/disassembly processes

Create leaner labor force with automation